Difference between revisions of "Modaso composting toilet"

From WaiWiki
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[Image:5TripsOfSand.jpg|thumb|left| 5 trips of sand for the Modaso base]]
+
[[Image:5TripsOfSand.jpg|thumb|left| Invoice for the sand]]
 +
[[Image:Modaso-pile-of-sand-A.jpg|thumb|right| 5 trips of sand for the Modaso base]]
 +
[[Image:Modaso-working-permit-A.jpg|thumb|left| Building permit]]
 +
[[Image:Modaso-pile-of-sand-B.jpg|thumb|right| 3 meters high]]
 +
[[Image:Modaso-working-permit-B.jpg|thumb|left| Permission to start the work]]
 +
 
 +
 
 
We bought 5 trips of sand on February 11, 2018. The sand needs to measure about 3 meters high prior to settling. After settling, the talud will serve as a base for the toilet to be build on. 5 trips cost Ghc 2,250 which amounted to about 430 euro.
 
We bought 5 trips of sand on February 11, 2018. The sand needs to measure about 3 meters high prior to settling. After settling, the talud will serve as a base for the toilet to be build on. 5 trips cost Ghc 2,250 which amounted to about 430 euro.
  

Latest revision as of 17:24, 21 February 2018

Invoice for the sand
5 trips of sand for the Modaso base
Building permit
3 meters high
Permission to start the work


We bought 5 trips of sand on February 11, 2018. The sand needs to measure about 3 meters high prior to settling. After settling, the talud will serve as a base for the toilet to be build on. 5 trips cost Ghc 2,250 which amounted to about 430 euro.

.

.