Difference between revisions of "Modaso composting toilet"
From WaiWiki
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | [[Image:5TripsOfSand.jpg|thumb|left| 5 trips of sand for the Modaso base]] | + | [[Image:5TripsOfSand.jpg|thumb|left| Invoice for the sand]] |
+ | [[Image:Modaso-pile-of-sand-A.jpg|thumb|right| 5 trips of sand for the Modaso base]] | ||
+ | [[Image:Modaso-working-permit-A.jpg|thumb|left| Building permit]] | ||
+ | [[Image:Modaso-pile-of-sand-B.jpg|thumb|right| 3 meters high]] | ||
+ | [[Image:Modaso-working-permit-B.jpg|thumb|left| Permission to start the work]] | ||
+ | |||
+ | |||
We bought 5 trips of sand on February 11, 2018. The sand needs to measure about 3 meters high prior to settling. After settling, the talud will serve as a base for the toilet to be build on. 5 trips cost Ghc 2,250 which amounted to about 430 euro. | We bought 5 trips of sand on February 11, 2018. The sand needs to measure about 3 meters high prior to settling. After settling, the talud will serve as a base for the toilet to be build on. 5 trips cost Ghc 2,250 which amounted to about 430 euro. | ||